MetaNow
VivaTech · Paris 2026
A live venture by ENGIE

Building a digester is the first challenge. Keeping it fed is the hard part.

MetaNow is the operating system for biomethane feedstock — the coordination layer ENGIE built to keep every plant running at capacity.

Farm
Digester
Grid
Manure & crop residues become green gas — in the existing pipes.
Europe needs ~5× more biomethane by 2030 — 35 bcm, up from ~7 today.
The bottleneck

Right now, that supply chain is phone calls and spreadsheets.

Supply
One plant pulls feedstock from dozens of dispersed farms — coordinated today by phone, SMS, paper and constant on-site visits.
Proof
Every tonne now needs proof of origin. RED III made traceability mandatory, not optional.
Now multiply by four. France targets ~ more biomethane by 2030 — every new plant chasing the same local supply.
Live today · 22 ENGIE sites

Not a prototype. A platform already in the field.

Suppliers
Farmers offer feedstock, get contracted, and get paid — in a few taps.
Operators
Operators fill the digester, lock contracts, and prove every tonne — automatically.
image à venirMetaNow — pick your need
Pick your need
image à venirOffer feedstock
Offer feedstock
image à venirMap your plots
Map your plots
image à venirRequest digestate
Request digestate
From first contact to signed supply — with a RED III audit trail by default.
Live today — 22 ENGIE units · 700+ GWh/yr · #1 biomethane producer in France.
How it gets built

Built with the field.

ENGIE Renewable Gases Europe
ENGIE BiOZ
ENGIE Research and Innovation
The bet
Tomorrow, Europe's feedstock moves through one layer. The infrastructure green gas scales on — every tonne sourced, matched, and traceable.
0
connected sites — our next milestone
0
France's 2030 biomethane target
0
traceable
ENGIE is scaling this now — partner with us. · metanow.energy
Sources: SDES & GRDF / France Gaz Renouvelable (end-2024) · REPowerEU & EBA (35 bcm by 2030) · PPE3, décret n°2026-76 · ENGIE
The feedstock
layer.